Assets built to serve the next job, too.

Mine Ops projects are designed around durable capacity: resources, storage, mobility, energy, and the infrastructure that connects them.

Lawson Photovoltaic Generation Facility solar array.
Energy infrastructure

Lawson Photovoltaic Generation Facility.

The Lawson facility is a Mine Ops Power Division project built to add dependable renewable generation to the company's electrical network.

Its fixed-tilt array is designed for utility-scale operation, with remote oversight, scheduled maintenance, and room for future expansion.

Read the announcement
Commercial operation 2026
Nameplate capacity 3.0 MWdc
Maximum export 2.7 MWac
Expected annual output ~5.5 GWh

Facility profile

Location Lawson Industrial District
Facility type Utility-scale photovoltaic generating station
Owner / operator Mine Ops Power Division
Grid interconnection Mine Ops 34.6 kV distribution network
Collection voltage 34.6 kV
Array configuration Fixed-tilt photovoltaic array; 11 rows

Performance & footprint

Equivalent modules 15,180
Estimated module surface 15,180 m²
Approximate site footprint 3.8 acres (1.5 hectares)
Estimated capacity factor 21%
Estimated annual emissions avoided ~2,000 metric tonnes CO₂
Operations 24-hour remote monitoring, utility-grade protection, and scheduled preventive maintenance